1. Main objective of boiler trial is ? a) To determine the generating capacity of the boiler b) To determine the thermal efficiency of the boiler, when working at a definite pressure c) To prepare heat balance sheet for the boiler d) All of the above Ans. d 2. Device used to put off fire in the furnace of the boiler, when the level of water in the boiler falls to an unsafe limit, is ? a) Safety valve b) Fusible plug c) Blow off cock d) Stop valve Ans. b 3. The shell of the cochran boiler is made hemispherical ? a) To provide maximum strength and space b) To withstand high pressure inside c) Both ( a ) and ( b ) d) None of these Ans. c 4. The dryness fraction of steam within a turbine is not allowed to fall below ? a) 0.5 b) 0.9 c) 0.95 d) 0.99 Ans. b 5. With increase in pressure ? a) Enthalpy of dry saturated steam increase b) Enthalpy of dry saturated steam remains same c) Enthalpy of dry saturated steam decreases d) Enthalpy of dry saturated steam first increase and then decrease
Power plant guruji site basically includes the detailed study of power plant operation and maintenance, its related all calculations and thumb rules. It also involves detailed troubleshooting guides for operation and maintenance of power plant processes and equipments.